Summit Leisure
 

Laying The Pipework

Once most of the shingle had been poured it was time to sort out the main pipework, here you can see the additional lengths of pipework coming from the main bottom drain around the pool to where they will eventually go in to where the pump house will be situated. A block was placed under the pipe to give it additional support.

< Previous :: Next >

Summit Leisure Website Design by South Online © 2006 :: Site Map :: Other Resources :: Home