![]() |
![]() |
| Block & Liner Pool Kits | Panel Pool Kits | Contact Us |
![]() |
Digging Out The Pool
A mini digger was hired to excavate the soil from the hole for the pool. An overdig of 12" all round is required to allow for the backfilling and concrete blocks. We decided upon a constant depth of 5'. |
| Summit Leisure Website Design by South Online © 2006 :: Site Map :: Other Resources :: Home |