Summit Leisure
 

Pouring The Concrete Foundations

Once all the bottom shuttering is checked & level and the pipework for the bottoms drain is secure, concrete is poured down to form the foundations for the concrete block walls.

< Previous :: Next >

Summit Leisure Website Design by South Online © 2006 :: Site Map :: Other Resources :: Home