Laying the foundation for the swimming pool’s block walls

Once the dig is completed, next comes the building of the pool walls. Before you start laying any blocks, however, a concrete foundation for the walls to sit on is cast around the perimeter of the bottom of the excavated hole, following the dimensions in your Summit Leisure pool kit manual. Also cast into this foundation is a section of pipe which will join the main drains in the deepest part of the pool, up with the other pool pipe runs which meet up in the plant room. Once this foundation has hardened and cured, the block work can begin.

Continue to ‘Laying the swimming pool block walls’ ->

<- Go back to ‘Excavating the pool’